Wednesday, January 28, 2026
spot_img

15 Job Opportunities MWENDOKASI at Dar es Salaam Bus Rapid Transit (DART)

15 Job Opportunities MWENDOKASI at Dar es Salaam Bus Rapid Transit (DART)




Overview

Dar es Salaam bus rapid transit is a bus rapid transit system that began operations on 10 May 2016 in Dar es Salaam, Tanzania.The transit system consists of 6 phases and the construction of the first phase began in April 2012 by the Austrian construction company Strabag International GmbH. Construction of the first phase was completed in December 2015 at a total cost of €134 million funded by the African Development Bank, World Bank and the Government of Tanzania.

The first phase of the project has a total length of 21.1 kilometers with dedicated bus lanes on three trunk routes with a total of 29 stations.The entire system is operated by The Usafiri salama Dar es Salaam Rapid Transit (UDA-RT) under the surveillance of the Surface and Marine Transport regulatory authority (Sumatra) Currently, the route is serviced by a fleet of 140 Chinese built Golden Dragon buses, providing express and local service for 18 hours daily from 05:00am to 11:00pm.

 

CLICK HERE TO —>>DOWNLOAD FREE CV TEMPLATES FROM MICROSOFT 2021 FOR YOUR JOB APPLICATION

 

History

With the rapidly growing population of the city, the government began to draw plans for a rapid transit system in 2003. The government predicted the city population to grow over 5 million by 2015 and invited the Japan International Cooperation Agency to design a master plan for transport in the city in June 2008.

A bus rapid transit and a metro transit system were proposed but the metro system was not approved due to the high construction and operational cost involved. The project was placed under the Prime Minister’s office and a Dar Rapid Transit Agency (DART) was created through a government notice on 25 May 2007. A 130 km bus rapid transit was planned to cover over 90% of the city’s population and the project was split into six phases due to the large investment required.

The initial project cost was financed by the world bank and the bank provided $180 million for the construction of the first phase.

Read full job details and mode of application in PDF file below:

Deadline: 13th June, 2021

Vacancies: Various Posts




DOWNLOAD PDF FILE HERE

 

Hot this week

NGAZI NA VIWANGO VYA MISHAHARA SERIKALINI | Public Servant Salary Scales – Tanzania

In 2014 , the Government implemented new Salary Scales,...

Community Growth Manager- Remote

Responsibilities We are seeking passionate, dedicated people to join as Community...

PROCEDURES AND REQUIREMENTS ON HOW TO GET TANZANIA PASSPORTS AND TRAVEL DOCUMENTS

Tanzania government issues various types of passports and other...

UNIVERSITY OF EDINBURGH JULIUS NYERERE MASTERS SCHOLARSHIPS 2025 FOR TANZANIANS TO STUDY IN THE UK (FUNDED)

Application Deadline:  28th January 2025.  Applications are now open for the...

Retail Sales Associate – Adidas

Full job description   RETAIL SALES ASSOCIATE Department: Retail Operations Direct Reporting Line:...

Digital Sales Representative required in South Africa

Full job description Job Overview Date Posted: Posted 7 days...

General Assistant – ADvTECH

Full job description The ADvTECH Schools Division leads the private...

MARKETING AND COMMUNITATIONS MANAGER, LALIGA SOUTH AFRICA (3363)

Full job description Are you interested in developing an international...

Central Data Capturer – Centurion – Ampath Laboratories

Full job description Advert Reference: P13870 Central Data Capturer - Centurion Job...

Apprenticeship (x40) – Afgri South Africa

Full job description AFGRI is offering an opportunity for an...
spot_img

Related Articles

Popular Categories

spot_imgspot_img